Construction of the brand new 3-story warehouse building (left) adjacent to the BEC calcium silicate manufacturing building (right) is now complete. Each floor is 35,520
Posted on July 29, 2022 in Uncategorized
A Resource For Calcium Silicate Industrial Insulation
Posted on July 29, 2022 in Uncategorized
Construction of the brand new 3-story warehouse building (left) adjacent to the BEC calcium silicate manufacturing building (right) is now complete. Each floor is 35,520